ALERTS

  • Season is over, we are not grooming or monitoring trails anymore


Welcome to Coq Snow.  Our riding area is just off the Coquihalla Highway, Exit #228 (Britton Creek rest area) between Hope and Merritt B.C.  (Show Map And Directions).  We have great riding areas for Beginners to Expert riders.  We groom over 100 Km of trails, giving easy access to different riding areas. We even have groomed trails through the Alpine so beginners can also enjoy the Alpine.  Our main trails to Alpine are quite short... Henning Alpine is 4Km from our Main Parking lot, Thynne Alpine is 3Km and 10-K Alpine around 15Km.   We have lots of areas with Simple Terrain so you can have a fun/safe day even during High avalanche conditions.  We also have two cabins in the Alpine stocked with firewood.  All the wet West Coast weather dumps as snow on the Coq, so frequent Awesome snow days. There's also accommodations right next to the riding area... Coquihalla Lakes Lodge.  We have our own parking lot, so lots of room for any size rig you might have and very easy access just off the Coquihalla Hwy (4x4 recommended).  We also added a loading dock and a heated changing room in the parking lot area...  how about that.  Check out the Coquihalla Summit for an awesome sledding experience.

Current Grooming

  • We are shut-down for the season.  Huge THANK-YOU to all our volunteer Groomer operators

    Apr 3 Wed – Henning Trail up

    Mar 28 Thu – Henning Trail up and Top Loop, 10-K to Cabin.  Rock is showing middle of Corner 3 – easy to avoid, just watch out for it


Trail Grooming Status

  • H E N N I N G   M O U N T A I N 
    Trail to Cabin – APR 3
    Henning Peak – MAR 2
    Coq Hwy – MAR 28
    Avalanche – MAR 28
    Polaris – MAR 6
    Ski-Doo – .
    Pipeline North – MAR 9
    Pipeline to Coq Lake South – FEB 29

    T H Y N N E   M O U N T A I N
    Trail to Ridge – NOT USABLE

    1 0 – K   (COQUIHALLA MTN)
    Trail to Cabin – MAR 28
    Cranberry Loop (16-K) – MAR 6 (Ravine filled)
    Britton FSR – MAR 6 (closed 5->8K)
    B5 Clearcuts – .
    Grasshopper – MAR 6
    Holm FSR South – MAR 6
    Holm FSR North – .
    Skwum FSR – FEB 15


Calendar Events

0-K Parking Lot (1110m)

10-K Cabin (1820m)

Henning Mtn. (1800m)

BC Highway Webcams
Portia North
Portia North
Box Canyon North
Box Canyon North
Snowshed North
Showshed North
Snowshed South
Snowshed South
Zopkios South
Zopkios South
Zopkios North
Zopkios North
Coquihalla Lakes North
Coquihalla Lakes North
Britton Creek North
Britton Creek North
Mine Creek South
Mine Creek South
Larson Hill North
Larson Hill North

Coquihalla Highway - Hope to Merritt
Sunday July 21, 2024 at 01:05 UTC

The forecasts for the B.C. Travellers Routes have ended for the season and will resume on October 1.
Choose highway to view conditions for:


Highway 1 NorthboundHighway 1 (TransCanada Highway), northbound. Electrical maintenance planned between Exit 14 and Exit 16: Leigh Rd (Langford). Starting Mon Jul 22 at 7:00 AM PDT until Fri Jul 26 at 7:00 AM PDT. Exit ramp will be closed. Watch for traffic control personnel. Next update time Fri Jul 26 at 7:00 AM PDT. Last updated Thu Jun 27 at 9:25 AM PDT. (DBC-65638)
Highway 1 Highway 1 (TransCanada Highway). Rest area closure planned between Exit 73 and Bradner Rd (Abbotsford). Starting Fri Jul 26. Refer to Highway 1 Project page for more information: www.Gov.Bc.Ca/264toHighway11#bradner. Next update time Fri Jul 26 at 10:00 AM PDT. Last updated Fri Jul 12 at 11:24 AM PDT. (DBC-66117)
Highway 1 Both DirectionsHighway 1 (TransCanada Highway), in both directions. Bridge construction at Nicomen River Rd (14 km east of Lytton). Until Sat Nov 30. Single lane alternating traffic. Watch for traffic control. Expect delays. Speed reduced to 30km/hr. Highway stoppages with expected delays of 15 minutes. Project completion: Nov 30, 2024. Next update time Mon Jul 29 at 10:00 AM PDT. Last updated Mon Jul 15 at 11:10 AM PDT. (DBC-56391)
Highway 1 Both DirectionsHighway 1 (TransCanada Highway), in both directions. Travel advisory in effect between Junction Hwy 8 and Cornwall Rd for 39.1 km (9 km south of Cache Creek to Spences Bridge). Wildfire activity may cause Highway to close on short notice. Motorists are advised to exercise caution when travelling and consider alternate routes. No commercial vehicle access on Hwy 8. Next update time Sun Jul 21 at 12:00 PM PDT. Last updated Sat Jul 20 at 12:00 PM PDT. (DBC-66349)
Highway 1 Highway 1 (TransCanada Highway). Vehicle incident between Little River Rd and Lindburg Rd for 0.5 km (12 km east of Chase). Road closed. Assessment in progress. Expect major delays. Alt route via Hwy 97, Hwy 97A & Hwy 97B. Next update time Sat Jul 20 at 7:00 PM PDT. Last updated Sat Jul 20 at 5:25 PM PDT. (DBC-66380)
Highway 1 Both DirectionsHighway 1 (Kicking Horse Pass), in both directions. Construction work between Golden Donald Upper Rd and Yoho Bridge for 5.3 km (2 to 7 km east of Golden). Until Wed Jul 31 at 5:30 PM MDT. Highway is reduced to one lane in each direction. 2-Hour closures between Sun July 28 at 10pm and Mon July 29 at 7am MDT. Watch for Traffic Control Personnel on site. Next update time Mon Jul 29 at 9:00 AM MDT. Last updated Mon Jul 8 at 8:46 AM MDT. (DBC-62137)
Highway 1 Both DirectionsHighway 1, in both directions. Utility work at Highway 18. Until Sat Aug 31. From 7:00 AM to 5:00 PM PDT on weekdays. Left turn lane closed. Right turn lane closed. Expect minor delays. Water main, storm sewer maintenance and road resurfacing. Lane closures in effect until project end. Watch for workers/vehicles on the shoulder. Last updated Mon Jun 3 at 9:51 AM PDT. (DBC-63012)
Highway 1 Both DirectionsHighway 1, in both directions. Road construction work at Highway 95. Until Sun Jul 21. Expect delays due to congestion. Railway construction work. Last updated Mon Jul 15 at 5:52 PM MDT. (DBC-66205)
Highway 1 NorthboundHighway 1, northbound. Construction work planned between Old Cariboo Rd and Todd Rd. Starting Mon Jul 22 until Fri Aug 9. From 7:00 AM to 6:00 PM PDT on weekdays. Lane Closure. Sidewalk replacement. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Thu Jul 18 at 11:38 AM PDT. (DBC-66319)
Highway 1 Both DirectionsHighway 1 (TransCanada Highway), in both directions. Construction work between Galloping Goose Trail and Exit 6: McKenzie Ave for 1.1 km (Saanich). Until Sat Dec 14 at 5:30 AM PDT. From 8:00 PM to 5:30 AM PDT on weekdays. Left lane is closed in both directions. Expect delays. Traffic reduced to single lane both directions, with a minimum width of 4m and no change to the minimum height. Speed limit reduced to 50km/h. Last updated Thu Jun 20 at 4:49 PM PDT. (DBC-65197)
Highway 1 NorthboundHighway 1 (TransCanada Highway), northbound. Bridge construction at Burnside Rd W (Saanich). Until Sat Dec 14 at 5:30 AM PDT. From 8:00 PM to 5:30 AM PDT on weekdays and Sunday. Right lane closed. Lane closure Sun to Thurs night for widening of the Eastbound Colquitz Bridge. Maximum width 4.0m. Speed limit reduced to 50 km/h. Left lane and offramp to Burnside Drive will remain open. Last updated Thu Jun 20 at 4:49 PM PDT. (DBC-64542)
Highway 1 Both DirectionsHighway 1 (TransCanada Highway), in both directions. Bridge maintenance between Mt Sicker Rd and Fuller Lake Rd for 3.7 km (Chemainus). Until Sat Nov 30 at 7:00 PM PDT. Lane closures in both directions. Construction speed zone. One bridge will be closed for repairs with traffic diverted onto adjacent bridge. For restrictions for oversize trucks with widths greater than 3.2m, consult CVSE Notice # 01-2024. Last updated Wed Jun 5 at 12:12 PM PDT. (DBC-53483)
Highway 1 NorthboundHighway 1 (TransCanada Highway), northbound. Utility work planned between Highview Terr and Needham St for 0.2 km (Nanaimo). Starting Wed Jul 24 at 9:30 AM PDT until Wed Jul 24 at 3:00 PM PDT. Roadway will be reduced to one lane. Right lane will be closed. BC Hydro pole replacement. Watch for traffic control and work crews. Last updated Mon Jul 8 at 2:03 PM PDT. (DBC-65981)
Highway 1 Both DirectionsHighway 1 (TransCanada Highway), in both directions. Utility work planned between Rosehill St and Cypress St for 0.1 km (Nanaimo). Starting Mon Aug 12 at 7:00 AM PDT until Thu Aug 15 at 7:00 PM PDT. Possible delays. Upgrade of watermain. Watch for traffic control personnel and work crews. Road reduced to one lane in both directions. Last updated Fri Jul 19 at 2:36 PM PDT. (DBC-66359)
Highway 1 EastboundHighway 1 (TransCanada Highway), eastbound. Construction work planned between Exit 13 and Keith Rd for 0.8 km (West Vancouver). Starting Mon Jul 22 at 7:30 AM PDT until Fri Oct 11 at 5:30 PM PDT. From 7:30 AM to 5:30 PM PDT daily. Possible delays. Shoulder maintenance planned. Sign placement Work is from Exit 13 to Hadden Drive. Last updated Tue Jul 9 at 5:49 PM PDT. (DBC-66044)
Highway 1 WestboundHighway 1 (TransCanada Highway), westbound. Bridge maintenance planned at Grandview Highway (Burnaby). Starting Mon Jul 22 at 10:00 PM PDT until Fri Jul 26 at 4:00 AM PDT. HOV lane will be closed. Left lane will be closed. Watch for traffic control personnel. Last updated Fri Jul 19 at 8:33 AM PDT. (DBC-66344)
Highway 1 EastboundHighway 1 (TransCanada Highway), eastbound. Construction work between Exit 37: Gaglardi Way and King Edward St for 3.2 km (Burnaby to Coquitlam). Until Fri Feb 28, 2025 at 7:00 AM PDT. From 9:30 PM to 7:00 AM PDT daily. Lane Closure. Expect delays. Lane closures are needed to move materials & equipment for the construction of TransLink's North Rd maintenance facility. Lane closures will be intermittent, implemented as necessary. Last updated Mon Apr 22 at 11:21 AM PDT. (DBC-60503)
Highway 1 Both DirectionsHighway 1 (TransCanada Highway), in both directions. Construction work between 208 St and Exit 73 for 9.3 km (Langley - District). Until Sat Nov 30 at 5:00 AM PDT. Lane Closure. Expect minor delays. Last updated Tue Jun 25 at 9:00 AM PDT. (DBC-65554)
Highway 1 Both DirectionsHighway 1 (TransCanada Highway), in both directions. Construction work between Exit 83: Mt Lehman Rd and Exit 87: Clearbrook Rd for 2.3 km (Abbotsford). Until Wed Jul 31. From 8:30 PM to 5:30 AM PDT on weekdays. Left lane is closed in both directions. Expect delays. Last updated Tue Jun 25 at 8:34 AM PDT. (DBC-65551)
Highway 1 Both DirectionsHighway 1 (TransCanada Highway), in both directions. Maintenance between Peardonville Rd and Exit 90: McCallum Rd for 5.0 km (Abbotsford). Until Wed Jul 31 at 5:30 AM PDT. From 8:30 PM to 5:30 AM PDT on weekdays. Left lane is closed. Night time construction work. Expect delays. Left lane closed in both directions. Last updated Tue Jul 16 at 12:09 PM PDT. (DBC-66241)
Highway 1 EastboundHighway 1 (TransCanada Highway), eastbound. Utility work planned between Exit 138: Bridal Falls Rd and Exit 146 for 8.1 km (5 to 14 km east of Chilliwack). Starting Mon Aug 19 at 8:00 AM PDT until Mon Aug 26 at 5:00 PM PDT. From 8:00 AM to 5:00 PM PDT daily. Right lane will be closed. BC Hydro pole replacement. Speed reduction to 80 km/h. Last updated Thu Jul 18 at 10:15 AM PDT. (DBC-66308)
Highway 1 EastboundHighway 1 (TransCanada Highway), eastbound. Utility work planned between Exit 138: Bridal Falls Rd and Exit 146 for 4.4 km (12 to 7 km east of Chilliwack). Starting Mon Jul 29 at 8:00 AM PDT until Fri Aug 9 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT daily. Shoulder will be closed. Right lane will be closed. Expect delays. No lane closures from 12pm-4pm August 1-6th. Last updated Thu Jul 18 at 10:55 AM PDT. (DBC-66312)
Highway 1 Both DirectionsHighway 1 (TransCanada Highway), in both directions. Utility work planned between Emory Creek Rd and Whiskey Fill Rd for 6.7 km (Yale). Starting Mon Aug 12 at 8:00 AM PDT until Fri Aug 23 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Mon Jul 15 at 10:21 AM PDT. (DBC-66186)
Highway 1 Both DirectionsHighway 1 (TransCanada Highway), in both directions. Paving operations between Pacific Way and Grand Blvd for 11.2 km (Kamloops). Until Fri Jul 26 at 6:00 AM PDT. From 7:00 PM to 6:00 AM PDT on weekdays and Sunday. Lane Closure. Watch for traffic control. Expect up to 15 minute delays. Next update time Fri Jul 26 at 6:00 AM PDT. Last updated Wed Jul 17 at 11:12 AM PDT. (DBC-64552)
Highway 1 Both DirectionsHighway 1 (TransCanada Highway), in both directions. Road maintenance work between Coburn St and Shuswap Ave for 0.7 km (Chase). From 6:00 AM to 5:00 PM PDT on weekdays. Road closed intermittently. Watch for traffic control. Next update time Fri Jul 26 at 10:00 AM PDT. Last updated Fri Jul 12 at 10:04 AM PDT. (DBC-64961)
Highway 1 Both DirectionsHighway 1 (TransCanada Highway), in both directions. Construction work between Ford Rd and Tappen Valley Rd for 3.2 km (Tappen). Until Tue Dec 31. From 7:00 AM to 12:00 AM PDT on weekdays and Saturday. Expect delays. Reduced speed through work zone at 80 km/hr during inactive work, 60 km/hr during active work. Intermittent minor stoppages. Last updated Tue May 28 at 2:20 PM PDT. (DBC-57219)
Highway 1 Both DirectionsHighway 1 (TransCanada Highway), in both directions. Ditching between Bolton Rd and Schneider Pl (1 km east of Tappen). Until Sat Aug 31. From 7:00 PM to 10:30 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays up to 20 minutes. Last updated Tue May 28 at 2:21 PM PDT. (DBC-64006)
Highway 1 Both DirectionsHighway 1 (TransCanada Highway), in both directions. Blasting between Tappen Beach Rd and 65 Ave NW (1 km west of Salmon Arm). Until Thu Oct 31. From 5:30 PM to 3:00 AM PDT and from 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Up to one 20 minute closure daily. Additional 5 minute closures may be required intermittently. Watch for traffic control. Last updated Tue May 28 at 2:20 PM PDT. (DBC-57687)
Highway 1 Highway 1 (TransCanada Highway). Utility work planned between Old Sicamous Rd and Finlayson St for 0.4 km (Sicamous). Starting Wed Jul 24 until Thu Jul 25. From 7:00 PM to 7:00 AM PDT on Thursday and Friday. Night time construction work planned. Single lane alternating traffic will be in effect. Last updated Fri Jul 19 at 4:05 PM PDT. (DBC-66361)
Highway 1 Both DirectionsHighway 1 (TransCanada Highway), in both directions. Watch for falling rocks between Eagle River at Kay Falls Bridge and Clanwilliam OH Bridge for 23.1 km (32 to 9 km west of Revelstoke). Watch for possible falling rocks. Last updated Sat Jul 20 at 3:00 PM PDT. (DBC-61839)
Highway 1 Both DirectionsHighway 1 (TransCanada Highway), in both directions. Construction work between Meadows in the Sky Pkwy and West Boundary of Mount Revelstoke National Park for 14.9 km (Revelstoke to 1 km west of West Boundary of Mount Revelstoke National Park). Until Thu Aug 1. From 7:00 PM to 7:00 AM PDT on weekdays and Sunday. Single lane alternating traffic. Up to 15 min delays. Obey traffic control personnel. Last updated Mon Jun 17 at 1:03 PM PDT. (DBC-65189)
Highway 1 Both DirectionsHighway 1 (TransCanada Highway), in both directions. Watch for falling rocks between West Boundary of Mount Revelstoke National Park and Jumping Creek Rd for 25.3 km (1 km west of West Boundary of Mount Revelstoke National Park to 5 km west of West Boundary of Glacier National Park). Watch for possible falling rocks. Last updated Sat Jul 20 at 3:00 PM PDT. (DBC-61841)
Highway 1 Both DirectionsHighway 1 (TransCanada Highway), in both directions. Bridge construction between Albert Canyon West Bridge and Albert Canyon Rd (3 km east of East Boundary of Mount Revelstoke National Park). Until Sun Sep 15. From 7:00 AM to 5:30 PM PDT daily. Eastbound lane closure. Detour in effect. Speed reduction from 100 km/h to 60 km/h in effect. Watch for traffic control. No delays expected. Last updated Wed Jun 26 at 1:11 PM PDT. (DBC-65605)
Highway 1 Both DirectionsHighway 1 (TransCanada Highway), in both directions. Paving operations planned at Beaver Valley Rd (11 km east of Rogers Pass Summit). Starting Mon Jul 22 at 7:00 AM PDT until Wed Jul 24 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on Monday, Tuesday and Wednesday. Single lane alternating traffic will be in effect. Expect delays. Paving between the snowsheds and Beaver Valley. Watch for traffic control. Speed limit reduction to 50km/h. Last updated Sat Jul 20 at 1:45 AM PDT. (DBC-66331)
Highway 1 Both DirectionsHighway 1 (Kicking Horse Pass), in both directions. Watch for falling rocks between Golden Donald Upper Rd and Yoho Bridge (5 km east of Golden). Last updated Sat Jul 20 at 3:59 PM MDT. (DBC-44269)
Highway 3 EastboundHighway 3 (Crowsnest Highway), eastbound. Road construction work planned at Exit 173: Old Hope Princeton Way (Hope). Starting Thu Aug 1 at 8:00 AM PDT until Thu Aug 1 at 3:00 PM PDT. Possible delays. Traffic Control will be on Old Hope Princeton between 6th Ave and Forest Crescent. Last updated Tue Jul 9 at 3:17 PM PDT. (DBC-66033)
Highway 3 Highway 3 (Crowsnest Highway). Bridge maintenance planned at Exit 173: Old Hope Princeton Way (Hope). Starting Mon Jul 22 at 7:30 AM PDT until Mon Jul 22 at 6:30 PM PDT. Drive with caution and obey closure speed reduction. Bridge deck repair. Last updated Fri Jul 19 at 4:03 PM PDT. (DBC-66363)
Highway 3 Highway 3 (Crowsnest Highway). Blasting between Exit 177 and First Avalanche Gate for 4.7 km (3 to 8 km east of Hope). Until Fri Aug 2 at 3:00 PM PDT. Road closed intermittently. Last updated Thu Jun 13 at 2:51 PM PDT. (DBC-65173)
Highway 3 Highway 3 (Crowsnest Highway). Utility work planned between Second Avalanche Gate and Allison Pass Summit for 5.4 km (34 to 40 km east of Hope). Starting Mon Jul 29 at 9:00 AM PDT until Sat Aug 3 at 4:00 PM PDT. From 9:00 AM to 4:00 PM PDT on weekdays and Saturday. Single lane alternating traffic will be in effect. Expect delays. BC Hydro utility work. Last updated Thu Jul 18 at 9:36 AM PDT. (DBC-66306)
Highway 3 Highway 3 (Crowsnest Highway). Special event planned between Allison Pass Summit and Monument 78-Monument 83 Trail for 3.0 km (63 km east of Hope to 62 km west of Princeton). Starting Fri Aug 9 at 4:00 PM PDT until Sat Aug 10 at 4:00 AM PDT. Use caution, watch for runners. Last updated Mon Jun 3 at 12:00 PM PDT. (DBC-64746)
Highway 3 Both DirectionsHighway 3 (Crowsnest Highway), in both directions. Utility work planned between Sunday Summit and Kennedy Lake Rd for 14.8 km (17 to 32 km west of Princeton). Starting Wed Jul 24 at 8:00 AM PDT until Wed Jul 24 at 4:00 PM PDT. Right lane will be closed in both directions. Cable repair and pole replacement. Last updated Thu Jul 18 at 3:15 PM PDT. (DBC-66328)
Highway 3 Both DirectionsHighway 3 (Crowsnest Highway), in both directions. Crack sealing is underway between East Lake Dr and Paulson Bridge for 17.1 km (Christina Lake). Until Thu Jul 25 at 7:00 PM PDT. Single lane alternating traffic. Pilot car controlled from Lafferty Pit Road to Paulson Bridge. 20 minute delays. MOTORCYCLISTS: loose gravel, ride with caution. Last updated Wed Jul 17 at 2:58 PM PDT. (DBC-66283)
Highway 3 Highway 3 (Crowsnest Highway). Bridge maintenance planned between Crestview Cres and Columbia Ave for 0.3 km (Castlegar). Starting Mon Jul 22 at 6:00 AM PDT until Mon Jul 22 at 2:00 PM PDT. Lane closures in both directions planned. Last updated Thu Jul 18 at 1:43 PM PDT. (DBC-66323)
Highway 3 EastboundHighway 3 (Crowsnest Highway), eastbound. Paving operations between Mannix Rd and Columbia Ave for 4.3 km (Castlegar). Until Fri Jul 26 at 6:30 AM PDT. From 5:30 PM to 6:30 AM PDT on weekdays and Sunday. Single lane alternating traffic. Night time milling and paving. Reduce speed. Watch for crew and equipment. Watch for uneven pavement and milled surfaces. Last updated Sun Jun 30 at 1:51 PM PDT. (DBC-65694)
Highway 3 Both DirectionsHighway 3 (Crowsnest Highway), in both directions. Bridge construction at Jaffray Overhead Bridge (5 km east of Jaffray). Until Sat Aug 31. Expect delays. Watch for flagging to allow for trucks to enter and exit site. Watch for speed reductions and crews working in the area. Last updated Sat Jul 13 at 2:32 PM MDT. (DBC-60199)
Highway 5 Highway 5 (Coquihalla South). Bridge maintenance planned between the start of Highway 5 (Coquihalla South) and Exit 183: Othello Rd (2 km north of Hope). Starting Mon Jul 22 at 6:00 AM PDT until Fri Aug 2 at 7:00 PM PDT. Right lane will be closed. Crews are doing bridge deck maintenance on Nicolum Bridge on Highway 5, Monday thru Friday. The closure will be in the Southbound Slow lane. Last updated Sat Jul 20 at 1:41 AM PDT. (DBC-66365)
Highway 5 NorthboundHighway 5 (Coquihalla South), northbound. Road maintenance work between Exit 183: Othello Rd and Exit 192 (15 km north of Hope). Until Fri Sep 13. From 9:00 AM to 5:00 PM PDT daily. Right lane closed. Watch for traffic control. Last updated Tue Jun 4 at 11:21 AM PDT. (DBC-64797)
Highway 5 SouthboundHighway 5 (Coquihalla North), southbound. Utility work between West Kamloops and Inks Lake Rd for 1.9 km (Kamloops). Until Fri Jul 26. From 8:00 AM to 4:00 PM PDT on weekdays and Saturday. Right lane closed. Watch for traffic control. Last updated Thu Jun 27 at 11:05 AM PDT. (DBC-65642)
Highway 5 NorthboundHighway 5, northbound. Utility work planned between Webb Rd and Mount Olie St for 1.9 km (Little Fort). Starting Tue Aug 6 until Fri Aug 9. From 8:00 AM to 4:00 PM PDT daily. Lane Closure. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Fri Jul 19 at 11:21 AM PDT. (DBC-66286)
Highway 5 SouthboundHighway 5, southbound. Utility work between Bain Rd and Clearwater Village Rd for 1.4 km (Clearwater). Until Wed Jul 31. From 7:00 AM to 7:00 PM PDT daily. Single lane alternating traffic. Watch for traffic control. Last updated Tue Jun 25 at 3:27 PM PDT. (DBC-65568)
Highway 5 SouthboundHighway 5, southbound. Construction work planned between Vavenby Bridge Rd and Harmon Rd for 2.6 km (Vavenby). Starting Mon Jul 22 until Sat Jul 27. From 8:00 AM to 6:00 PM PDT daily. Lane Closure. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Wed Jul 17 at 2:48 PM PDT. (DBC-66282)
Highway 5 SouthboundHighway 5, southbound. Utility work between Gosnell Rd and Moonbeam Bridge for 2.0 km (40 to 42 km north of Blue River). Until Wed Jul 31 at 5:00 PM PDT. Shoulder closed. Lane Closure. Single lane alternating traffic. Watch for traffic control. Last updated Fri Jul 5 at 8:58 AM PDT. (DBC-65612)

Chilliwack Forecast

Current Conditions

30.6 C

Sat night

Low 18.
Clear

Sun

High 31.
Mainly sunny

Sun night

Low 16.
Clearing

Mon

High 25.
Sunny

Mon night

Low 13.
Clear

Tues

High 24.
Sunny

Tues night

Low 14.
Clear

Wed

High 26.
Sunny

Hope Forecast

Current Conditions


30.7 C

Sat night

Low 18.
Clear

Sun

High 30.
Mainly sunny

Sun night

Low 17.
Clearing

Mon

High 25.
Sunny

Mon night

Low 13.
Clear

Tues

High 24.
Sunny

Tues night

Low 14.
Clear

Wed

High 26.
Sunny

Merritt Forecast

Current Conditions

35.7 C

Sat night

Low 15.
Clear

Sun

High 37.
Mainly sunny

Sun night

Low 17.
Partly cloudy

Mon

High 33.
Sunny

Mon night

Low 16.
Clear

Tues

High 29.
Sunny

Tues night

Low 13.
Clear

Wed

High 30.
Sunny

MISC INFO

AST-1 COURSE DETAILS 

- Classroom time is now done ON-LINE.  There are several short Avalanche video's you'll need to watch, then one Zoom meeting for the classroom time.  There is one field day in the snow.   You don't need to be an experienced rider to take the course.

- you do need your own sled and you must have a Beacon, Shovel and Probe (like every sledder should have).

- you will gain knowledge and skills to help you stay out of harm's way using the planning technology available via Avalanche Canada and other resources.

- you will learn to look critically at winter landscape, judging the terrain and snowpack, detect danger zones and safe routes to follow

- you will become fast and accurate rescuers, honing your skills with avalanche transceiver, probe and shovel, getting you prepared for any situation.

- $350 per person, $300 for CoqSnow members, Youth/Volunteers $250, $100 discount if you've taken course before.

- Text or Call Gerald @ 604-316-1600 to sign-up